Feeds:
Posts
Comments

Posts Tagged ‘Indian River Trailhead’

Cyclists ride on the Sitka Cross Trail (Photo courtesy of KCAW-Raven Radio)

To celebrate National Bike Month, Sitka Trail Works and the Sitka Bicycle Friendly Community Coalition invites the public to a free bike tour, guided by Doug Osborne, on the Sitka Cross Trail. The event is scheduled for 9 a.m. on Saturday, May 27,  and will meet at the Indian River trailhead.

The tour is approximately a 10 miles, moderate to strenuous ride to Kramer Drive and back to the trailhead. The Indian River trailhead parking lot is up Indian River Road a half mile; take a right off Indian River Road across from Peter Simpson Road.

The trail parallels Yaw Drive and then crosses a beautiful muskeg with stunted forest fringe, travels through old growth forest to the Gavin Hill Trail intersection at about the one-mile mark and passes through young forests growing back after harvest. At 1.7 miles the trail branches off to Sitka High School and also widens where it is located over an old logging road. The trail continues on 0.2 mile coming out behind the Kimsham ball fields; then passes the uphill side of the water tower and continues another 0.8 miles, crossing a wooden bridge over Cascade Creek, then a short steep uphill and on to the Kramer Avenue trailhead.

For more information, call 747-7244, or visit http://www.sitkatrailworks.org.

Advertisements

Read Full Post »

XTRAIL1_500

Cyclists ride on the Sitka Cross Trail (Photo courtesy of KCAW-Raven Radio)

SitkaTrailWorkslogoThe public is invited to join Sitka Trail Works on a free guided bike tour Saturday, Aug. 27, on the Sitka Cross Trial. Meet at 9 a.m. at the Indian River trailhead.

The tour is approximately a 10-mile moderate to strenuous ride to Kramer Drive and back to the trailhead. The trailhead is up Indian River Road, take a right across from Peter Simpson Road to the Indian River Trailhead parking lot.

The Cross Trail is about .2 mile up the Indian River Trail. The trail begins on the flood plain of Indian River among huge Sitka spruce and western hemlock. It continues through bogs with stunted forest fringe, intersects the Gavin Hill Trail at about the 1-mile mark and passes through young forests growing back after harvest. At 1.7 miles the trail branches off to Sitka High School and also widens where it is located over an old logging road. The trail continues on 0.2 mile coming out behind the baseball field; then passes the uphill side of the water tower and continues another 0.8 mile crossing a wooden bridge over Cascade Creek, then a short steep uphill and on to the Kramer Avenue trailhead.

Sitka Trail Works board members Sara Bergendahl and Brian Hanson will lead the tour. For more information, call 747-7244 or visit http://www.sitkatrailworks.org.

Read Full Post »

Cross Phases 4&5 4-15

trail complete4-15The City and Borough of Sitka, in cooperation with Sitka Trail Works, has been working on improvements to and reconstruction of the Sitka Cross Trail since last spring.

Using grants the city received from the Alaska Department of Transportation and the Federal Lands Access Program (FLAP), a Rasmuson Foundation grant and Sitka Trail Works donations, 1.25 miles of new trail is now complete. The old Cross Trail has been upgraded to an eight-foot-wide multimodal pathway standard, from Sitka High School to Yaw Drive and a separated path was constructed along Yaw Drive to the Indian River Trailhead parking lot. If walkers park in the Indian River/Cross Trail Trailhead parking lot off Indian River Road, the separated path now starts across the road at Peter Simpson Drive and runs along Yaw Drive to the main Cross Trail.

Sitka Trail Works has begun construction of Phase 5 of the Cross Trail Multimodal Pathway. Approximately one mile of multimodal trail will be constructed to replace the lower portion of Gavan Hill Trail. The new section of the Cross Trail will share a trailhead with the Gavan Hill Trail at the end of Baranof Street. The Phase 5 pathway will provide access to the Cross Trail and Gavan Hill Trail from downtown and surrounding neighborhoods. The lower part of Gavan Hill Trail will be abandoned.

During construction heavy equipment will be using neighborhood streets. Trail construction materials will be staged at the end of Pherson Street and adjacent to the city cemetery. Residents are asked to “excuse our mess,” truck traffic and noise during construction, and avoid the staging areas. Construction will be complete in the fall.

For further information, please contact Lynne Brandon of the Sitka Department of Parks and Recreation at 747-1852, or Deborah Lyons of Sitka Trail Works at 747-7244.

Read Full Post »